亚洲乱亚洲妇无码|欧美日韩一区二区综合|日韩成人高精品一区二区|久久一区二区三区免费播放|99国产精品视频免费观看|91国内在线观看在线观看|91麻豆精品国产综合久久久|日本婷婷99精品国产91久久

歡迎訪(fǎng)問(wèn)永誠(chéng)廣建公路材料(山東)有限公司網(wǎng)站!

永誠(chéng)廣建公路材料(山東)有限公司

熱線(xiàn)電話(huà)

15165180688

您現(xiàn)在所在的位置 :首頁(yè) - 新聞中心 > 公司新聞

公司新聞

公路瀝青生產(chǎn)工藝流程

來(lái)源:http://m.yinyudi.com/ 日期:2024-12-24

       下面以某濟(jì)南瀝青生產(chǎn)廠(chǎng)家為例,介紹公路瀝青的生產(chǎn)工藝流程。首先,通過(guò)精煉、分離等一系列工藝處理得到原瀝青。原瀝青主要成分為碳?xì)浠衔?,與水不溶,比重大于1,黏度大,黑色或暗褐色半固體或膏狀物。然后,在瀝青罐區(qū)進(jìn)一步加工原瀝青,去除雜質(zhì),通過(guò)加熱、混合等處理,使其變成適合于公路鋪設(shè)的瀝青材料。具體工藝流程如下:

The following with some Jinan bitumen manufacturer for example, introduce the production process of highway bitumen. First, the raw bitumen is processed through a series of processes such as refining and separation. Raw bitumen is mainly composed of hydrocarbons, insoluble with water, with a weight greater than 1, a high viscosity, a black or dark brown semi-solid or paste. Then, in the bitumen area, the raw bitumen is further processed, impurities are removed, and it is turned into a bitumen material suitable for road laying through heating, mixing and other treatments. The specific process is as follows:

一、混合

將原瀝青、多級(jí)渣油、催化油加入瀝青混合罐中,進(jìn)行攪拌,調(diào)整瀝青質(zhì)量,保證產(chǎn)品的穩(wěn)定性和合格率。

1. Mixing

The original asphalt, multigrade residue and catalytic oil were added into the asphaltmixing tank, and the asphalt quality was adjusted to ensure the stability and qualified rate ofthe product.

二、加熱

將混合后的瀝青逐步加熱,通過(guò)蒸汽加熱管和回流器對(duì)瀝青進(jìn)行均勻高效的加熱,使其成為適于運(yùn)輸、鋪設(shè)的黏稠液態(tài)。

ll. Heating

The mixed asphalt is heated step by step, and the asphalt is uriformly heated through a steam heating pipe and a refiuc device.

Efficient heating makes it a viscous liquid suitable for transportation and laying.

三、過(guò)濾

瀝青材料在混合和加熱的過(guò)程中,可能會(huì)產(chǎn)生小顆粒的雜質(zhì)。因此,必須通過(guò)過(guò)濾去除雜質(zhì)。在這一流程中,常用多級(jí)過(guò)濾器,以準(zhǔn)確濾出所需要的顆粒,而不會(huì)過(guò)濾掉瀝青中的有用成分。

lll.Filtering

In the process of mixing and heating asphalt materials, small particles ofimpurities may be produced.Therefore, impurities must be removed by filtration.In this process, a multi-stage filter is used to accurately filter out the desiredparticles without filtering out the useful components in the asphalt.

四、儲(chǔ)存

經(jīng)過(guò)加工后的瀝青需要進(jìn)行儲(chǔ)存,儲(chǔ)存過(guò)程中需要保證瀝青的穩(wěn)定性質(zhì)量和純潔度。為了達(dá)到這個(gè)目的,通常采用封閉罐體進(jìn)行儲(chǔ)存。

IV. STORAGE

After processing asphalt needs to be stored, the storage process needs to ensure the stability of asphaltQuality and purity, For this purpose, dosed tanks are usually used for storage.

以上就是公路瀝青生產(chǎn)工藝的流程,每個(gè)工序都需要注意質(zhì)量和安全。20230327054955655

The above is the process of highway asphalt production, and each process needs to pay attention to quality and safety.

     感謝您的閱讀與觀(guān)看,本文的精彩內(nèi)容來(lái)自:永誠(chéng)廣建公路材料(山東)有限公司 我們會(huì)有更多的精彩內(nèi)容繼續(xù)為您呈現(xiàn),詳情請(qǐng)點(diǎn)擊:http://m.yinyudi.com

     Thank you for reading and watching, the wonderful content of this article comes from: Yongcheng Guangjian Highway Materials (Shan dong) Co., Ltd. We will continue to present more wonderful content for you, please click: http://m.yinyudi.com

  • 上一條:水泥穩(wěn)定碎石配合比
  • 下一條:
  • 相關(guān)產(chǎn)品: